(323) 435-0418

Project package

CSI Division 10 Specialties Package: What Is In It and How It Gets Bought

Compartments, accessories, lockers, fire specialties, and visual displays, taken off as one package.

Division 10 is the specialties package: the items that arrive as finished assemblies and get set after the walls are up. On a commercial job that means toilet compartments under 10 21 13, toilet and bath accessories under 10 28 00, lockers under 10 51 00, fire protection specialties under 10 44 00, and visual display units under 10 11 00. It is also the package that gets bought last, from five suppliers, with the finish schedule already approved. This page lists what is in it section by section, says what sets each count, and marks where the furnish only line stops.

Written for Architects writing the specification and GCs or purchasing managers buying out Division 10 on a commercial project.. 14 of 29 line items can ship from the catalog today; the rest we quote.

Toilet compartments, 10 21 13

Section 10 21 13 sits under 10 21 00 Compartments and Cubicles. Material sets the price of the whole section, and mounting style is settled with the structure rather than at buyout, because ceiling hung and floor to ceiling layouts need blocking above the ceiling that has to be in before the ceiling closes.

Line itemWhat drives itSupply
Compartments, solid plasticOne compartment per water closet off the fixture schedule, and HDPE is the default where the room gets wet or takes hard use.Quoted
Compartments, phenolicDenser than HDPE and better at holding hardware, so it is the answer for vandal prone and premium work.Quoted
Compartments, powder coated steelThe economical baseline for dry, low abuse rooms, and the line most often value engineered down to.Quoted
Compartments, stainless steelSpecified for appearance and durability in hospitality, transit, and premium office restrooms, and priced per compartment rather than per panel.Quoted
Wheelchair accessible compartmentSection 604.8.1.1 makes it 60 in. wide minimum and 56 in. or 59 in. deep depending on whether the water closet is wall hung or floor mounted, so it changes the layout and not just the hardware.Quoted
Ambulatory accessible compartmentSection 213.3.1 adds one where six or more compartments are provided, or where urinals and water closets total six or more fixtures, and Section 604.8.2.1 gives it its own width and depth.Quoted

Toilet and bath accessories, 10 28 00

The accessory schedule is where a Division 10 package gets lost. Surface, semi-recessed, and recessed versions of the same model need different things from the wall, so the schedule has to be settled before the walls close and the tile goes on.

Line itemWhat drives itSupply
Grab bars, side wall and rear wallTwo per accessible compartment, height set by Section 609.4 at 33 to 36 in. to the top of the gripping surface and length by Sections 604.5.1 and 604.5.2.Order online
Mirrors, fixed and tiltOne per lavatory, and Section 603.3 caps the bottom edge of the reflecting surface at 40 in. over a lavatory or countertop and 35 in. where it is not over one.Order online
Soap dispensers and faucetsOne per lavatory, and Section 309.4 caps the force to activate any of it at 5 pounds.Order online
Tissue, seat cover, and napkin disposal, or one combination unitA combination unit turns three wall openings into one, and a partition mounted dual access unit serves two compartments through a single cutout.Order online
Towel dispenser and waste receptacle unitsOne unit per lavatory group, recessed wherever Section 307.2 applies, which is any wall along a circulation path.Order online
Baby changing stationsOften required in both restrooms now, and the advisory to Section 604.8.1.1 says the required compartment space cannot be obstructed by a changing table.Order online

Accessories outside the toilet room

Division 10 lines that live outside the restroom walls. A takeoff drawn from the restroom elevations misses all five, and they come back as change orders at closeout.

Line itemWhat drives itSupply
Janitor closet shelves, mop holders, hook stripsOne set per closet, sized to the wall, and on the same accessory schedule as the restrooms.Order online
Utility and lavatory shelvesScheduled per room, and a shelf over a lavatory has to clear the mirror above it and the dispenser beside it.Order online
Robe hooks, coat hooks, and towel barsCounted per compartment door, changing cubicle, and staff room, with the reach ranges in Section 308 setting the accessible ones.Order online
Corridor and lobby waste receptaclesFreestanding units are an owner call, while recessed and semi-recessed bodies are a wall detail and belong in the submittal.Order online
Facial tissue, cup dispensers, and door stopsThe short lines at the end of the schedule, and the ones that hold up a closeout when they were never ordered.Order online

Lockers, 10 51 00

Openings are counted off the plan and the elevations. Everything that is not an opening, meaning trim, benches, sloped tops, and end panels, is priced separately and is the usual source of a short shipment.

Line itemWhat drives itSupply
Metal lockersThe dry corridor and break room spec, counted per opening with trim priced per run.Quoted
Solid plastic lockersThe wet room material, decided room by room rather than building wide.Quoted
Phenolic lockersTeam rooms and clubs, where hardware strength and engraved nameplates drive the choice.Quoted
Locker room benchesTheir own section at 10 51 53, and the line most often assumed to be inside the locker price.Quoted
Accessible lockers and their latchingSection 225.2.1 scopes how many of each locker type have to comply, and Section 309.4 caps the force to work the latch at 5 pounds.Quoted

Fire protection specialties, 10 44 00

Cabinets are a Division 10 line. The extinguishers that go in them and the sprinkler work around them are frequently on other POs, so state which of the three you are buying before anyone prices it.

Line itemWhat drives itSupply
Fire extinguisher cabinetsRecessed, semi-recessed, or surface is a wall thickness decision, and Section 307.2 allows 4 in. of projection between 27 in. and 80 in. above the floor.Quoted
Fire extinguishersType, size, and spacing come from NFPA 10 and the AHJ, so the cabinet is sized after the extinguisher is settled.Quoted
Cabinet lettering and extinguisher signageInspected on the same walkthrough as the cabinets, and usually expected from whoever supplies them.Quoted

Visual display units, 10 11 00

Boards are cut to the wall, so this section is made to order and carries its own lead time. Blocking has to be in the wall before the board arrives, which makes it the one Division 10 section that has to be coordinated during framing.

Line itemWhat drives itSupply
Porcelain steel magnetic whiteboardsThe institutional surface where boards get daily use, scheduled per room and per wall length.Order online
Glass dry erase boardsThe office aesthetic, and magnetic versions add a steel backer, which changes both the weight and the blocking.Order online
Tackboards and bulletin boardsCork where paper gets posted daily, sized to the wall rather than to a catalog size.Order online
Trim, map rails, and chalk traysPriced per board and easy to leave off, which strands an otherwise finished room.Quoted

Scopes that sit next to the package

A Division 10 submittal carries product data for each section, a schedule or shop drawing keyed to room numbers and elevations, finish samples for the architect's selection, rough-in dimensions for every recessed item, and warranty and maintenance data at closeout. What it does not carry is the work below, which belongs to other divisions. Name each one at buyout, before two suppliers both assume the other has it.

Line itemWhat drives itSupply
Door closersDivision 08 hardware, graded under ANSI/BHMA A156.4, and restroom doors are the openings most often left off a hardware schedule.Quoted
Panic exit devicesDivision 08 and life safety driven, set by occupant load and egress rather than by room finish.Quoted
Emergency eyewash stationsA plumbed fixture in Division 22, specified to ANSI Z358.1, sharing nothing with the specialties except the punch list.Quoted
Emergency safety showersSame division and same standard as the eyewash, and the tepid water supply behind it is a mechanical scope.Quoted
Restroom paper and soapUsually owner furnished, so agree who buys the first fill before the dispensers are set.Quoted
Cleaning chemicals and floor careNever in the specification and always needed on the day the building opens.Quoted

What the code requires

How many accessible compartments a toilet room needs

Section 213.3.1

Where toilet compartments are provided, at least one toilet compartment shall comply with 604.8.1 . In addition to the compartment required to comply with 604.8.1 , at least one compartment shall comply with 604.8.2 where six or more toilet compartments are provided, or where the combination of urinals and water closets totals six or more fixtures.
Source

Wheelchair accessible compartment size

Section 604.8.1.1

Wheelchair accessible compartments shall be 60 inches (1525 mm) wide minimum measured perpendicular to the side wall, and 56 inches (1420 mm) deep minimum for wall hung water closets and 59 inches (1500 mm) deep minimum for floor mounted water closets measured perpendicular to the rear wall. Wheelchair accessible compartments for children’s use shall be 60 inches (1525 mm) wide minimum measured perpendicular to the side wall, and 59 inches (1500 mm) deep minimum for wall hung and floor mounted water closets measured perpendicular to the rear wall.
Source

Grab bar height

Section 609.4

Grab bars shall be installed in a horizontal position, 33 inches (840 mm) minimum and 36 inches (915 mm) maximum above the finish floor measured to the top of the gripping surface, except that at water closets for children’s use complying with 604.9 , grab bars shall be installed in a horizontal position 18 inches (455 mm) minimum and 27 inches (685 mm) maximum above the finish floor measured to the top of the gripping surface. The height of the lower grab bar on the back wall of a bathtub shall comply with 607.4.1.1 or 607.4.2.1 .
Source

Projection limit for anything surface mounted

Section 307.2

Objects with leading edges more than 27 inches (685 mm) and not more than 80 inches (2030 mm) above the finish floor or ground shall protrude 4 inches (100 mm) maximum horizontally into the circulation path.
Source

Mirror mounting height

Section 603.3

Mirrors located above lavatories or countertops shall be installed with the bottom edge of the reflecting surface 40 inches (1015 mm) maximum above the finish floor or ground. Mirrors not located above lavatories or countertops shall be installed with the bottom edge of the reflecting surface 35 inches (890 mm) maximum above the finish floor or ground.
Source

Operable parts: dispensers, latches, and locker hardware

Section 309.4

Operable parts shall be operable with one hand and shall not require tight grasping, pinching, or twisting of the wrist. The force required to activate operable parts shall be 5 pounds (22.2 N) maximum.
Source

Division 10 Specialties Package: common questions

On most commercial jobs: toilet compartments under 10 21 13, toilet and bath accessories under 10 28 00, lockers under 10 51 00, fire protection specialties under 10 44 00, and visual display units under 10 11 00. Signage, wall and corner guards, and other specialties can also be scheduled in Division 10, so read the section list in the project manual instead of assuming the same five sections on every job.

Before you spec

Mounting heights on this job

Send the schedule, get one quote

Plans, a takeoff, or a list of part numbers. We come back in one business day with pricing and cut sheets for the whole package.